Our mission is to protect the habitat of Puget Sound tidelands from the underregulated expansion of new and intensive shellfish aquaculture methods. These methods were never anticipated when the Shoreline Management Act was passed. They are transforming the natural tideland ecosystems in Puget Sound and are resulting in a fractured shoreline habitat. In South Puget Sound much of this has been done with few if any meaningful shoreline permits and with limited public input. It is exactly what the Shoreline Management Act was intended to prevent.

Get involved and contact your elected officials to let them you do not support aquaculture's industrial transformation of Puget Sound's tidelands.

Governor Inslee:

Thursday, August 24, 2017

Cooke's Net Pen Failure: An Eclipse of the Facts

Time for Cooke to go. 
(See Public Notice for expansion below)
(Image from http://www.deepzoom.com/#)

If Cooke Aquaculture's net pens fail in the protected area around Cypress Island in a 3.5 knot current, who believes they won't fail in the Strait of Juan de Fuca where currents are no slower and they are exposed to storms? It's time for Cooke to shut these operations down and for agencies to stop the expansion of industrial aquaculture. (See Public Notice below)

Only the facts are being eclipsed
for the cause of this failure.

NOTICE OF APPLICATION AND PUBLIC HEARING NOTICE IS HEREBY GIVEN, pursuant to Section 26.10.410 & 430 CCC, that the Clallam County Department of Community Development has scheduled a public hearing before the Clallam County Hearings Examiner for September 7, 2017 at 2:00 p.m. in Room 160 of the Clallam County Courthouse, 223 East Fourth Street, Port Angeles, WA 98362. The purpose of the hearing is to review public testimony regarding the Shoreline Substantial Permit for the Cooke Aquaculture Pacific LLC (CAP) proposal to move their existing Atlantic salmon net pen operation from within Port Angeles Harbor (Ediz Hook) to an open water area in the Strait of Juan de Fuca that is located over 1.5 miles offshore and 3.8 miles east of terminus of Ediz Hook: Proposal: (SHR 2016-00002) The proposal would be comprised of fourteen (14) floating high density polyethylene (HDPE) plastic pipe circular net pens, which are designed for open water conditions. Each net pen will be 126 feet in diameter, 45 feet deep, and in approximately 100 foot deep water. The proposal also includes a 40 foot wide by 100 foot long feed barge. The height of the feed barge will be approximately 19 feet above the water level when empty and 14 feet when is fully loaded with about 350 tons of fish feed. The pens would be comprised of two rows of 7 pens each with a feed barge at the eastern end of the array. Each of the net pens and the feed barge would be located 72 feet apart from each other, and would be held in place by up to sixty 4,000 to 8,000 mooring anchor, anchor lines, chains, and hardware. This proposal would encompass 9.7 acres of water surface area and require a 52 acre Aquatic lease from the WA State Department of Natural Resources (DNR).Location of the Proposal: The CAP new aquaculture net pen facility is proposed to be located approximately 3.8 miles east of Ediz Hook, 1.8 miles north of Morse Creek, and approximately 1.5 miles north of Green Point, within Section 10, Township 30 North, Range 5 West, W.M. Information & Studies Submitted: A Joint Aquatic Resource Application (JARPA) with attachments, SEPA Environmental Checklist with attachments, Biological Evaluation, Current and Wave Report prepared by RPS Evans-Hamilton, Sediment Report prepared by RPS Evans-Hamilton, Mooring Analysis Report – Grid System prepared by Aqua Knowledge, and Visual Analysis Report (January 2016) were submitted with the application. Permits Required & Studies Submitted: Section 402 National Pollutant Discharge Elimination System (NPDES) Waste Discharge Permit and Coastal Zone Management Compliance Determination through the Washington Department of Ecology; Fin Fish Aquaculture Permit, Fin Fish Transport Permit, and Aquatic Farm Registration through Washington Department of Fish and Wildlife; Aquatic Use Authorization through DNR; Private Aids to Navigation with the United States Coast Guard; and Section 10 Permit Authorization with the U.S. Army Corps of Engineers, which will include ESA Section 7 Consultation with National Marine Fisheries Services and National Oceanic and Atmospheric Administration and U.S. Fish and Wildlife Service. State Environmental Policy Act (SEPA): Clallam County is lead agency and a SEPA environmental checklist (ECL 2016-03) has been submitted for the proposal. After review of the completed environmental checklist, the SEPA Memo dated July 5, 2017, and other information on file with the agency, the Clallam County Responsible Official has determined that a Mitigated Determination of Non-Significance (MDNS) should be issued for this proposal. The MDNS for this proposal was issued July 6, 2017, and the comment period for this threshold determination ends on July 24, 2017. Unless the Responsible Official withdraws the threshold determination pursuant to WAC 197-11-340(3)(a), the threshold determination shall be final at the end of the comment period. The Hearing Examiner will consider the adequacy of the Threshold Determination at the open record public hearing. Public hearing and comment deadlines: Any interested person may submit written or oral comments on the proposal and the threshold determination of a MDNS prior to the close of the open record hearing. The staff report will be available seven days before the hearing. Any person may also submit a written request to DCD to receive a notice of the decision once it is made. The application and above referenced material is available at DCD On-Line Permit System web site or at our offices at 223 E. 4th St., Suite 5, Port Angeles, WA 98362, Monday through Friday, between 8:00 a.m. – 4:30 p.m. Please contact Greg Ballard, Project Planner at (360) 565-2616, or by email at gballard@co.clallam.wa.us if you have any questions. Pub: July 9, 16, 2017 Legal No.766276

No comments:

Post a Comment